Blue Jacket substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Blue Jacket as the point of interconnection, all in Logan County, OH.
Target commercial operation dates as filed run from Sep 2023 to Feb 2025 (2 filings).
Transmission owner as filed: Dayton (1 filing).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-323 | Bellefontaine PV and BESS Project | 138 | 40 | Hybrid | Withdrawn | Sep 2023 |
| AH1-219 | Blue Jacket 138 kV | 138 | 23.9 | Hybrid | Withdrawn | Feb 2025 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Logan County, OH
- Liberty: 3 active, 185 MW of 5 filed
- Blue Jacket-Kirby: 1 active, 96.4 MW of 3 filed
- Blue Jacket - Kirby: 1 active, 21.3 MW of 3 filed
- Marysville-Sorenson: none active of 5 filed
- Marysville - Sorenson: none active of 4 filed
- Bellefontaine: none active of 2 filed