Substation Scout

Blue Jacket substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG1-323 Bellefontaine PV and BESS Project 138 40 Hybrid Withdrawn
AH1-219 Blue Jacket 138 kV 138 23.9 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.