Substation Scout

Marysville-Sorenson substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
AG1-003 Grange Solar 765 226 Hybrid Withdrawn
AF2-137 Grange Solar 765 210 Solar Withdrawn
AG1-004 Grange Solar 765 200 Battery Withdrawn
AG2-013 Marysville-Sorenson 765 kV 765 84 Solar Withdrawn
AC2-104 Marysville-Sorenson 765kv 765 65 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.