Marysville-Sorenson substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 5 with terminal status (shown grayed).

5 PJM queue filings name Marysville-Sorenson as the point of interconnection, all in OH.

Target commercial operation dates as filed run from Dec 2020 to Dec 2029 (5 filings).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG1-003 Grange Solar 765 226 Hybrid Withdrawn Dec 2023
AF2-137 Grange Solar 765 210 Solar Withdrawn Dec 2029
AG1-004 Grange Solar 765 200 Battery Withdrawn Dec 2023
AG2-013 Marysville-Sorenson 765 kV 765 84 Solar Withdrawn Dec 2023
AC2-104 Marysville-Sorenson 765kv 765 65 Wind Withdrawn Dec 2020

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Marysville-Sorenson” in OH. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.

Other PJM queue substations in Logan County, OH

All 20 PJM queue filings in Logan County, OH.

Other PJM queue substations in Van Wert County, OH

All 26 PJM queue filings in Van Wert County, OH.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first