Marysville - Sorenson substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AI2-081 Marysville - Sorenson 765 kV 765 271 Solar Withdrawn
AH2-147 Marysville - Sorenson 765 kV 765 108.4 Hybrid Withdrawn
AH2-010 Marysville - Sorenson 765 kV 765 60 Solar Withdrawn
AH1-198 Marysville - Sorenson 765 kV 765 33 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.