Blue Jacket - Kirby substation interconnection queue
1 active project totalling 21.3 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
21.3active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-320 | Blue Jacket - Kirby 138 kV | 138 | 69 | Battery | Withdrawn |
| AI2-146 | Blue Jacket - Kirby 138 kV | 138 | 67.1 | Solar | Withdrawn |
| AH1-328 | Blue Jacket - Kirby 138 kV | 138 | 21.3 | Solar | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.