Tupelo Energy Storage
PJM queue ID AG2-272
Tupelo Energy Storage (AG2-272) is listed in the PJM interconnection queue as a 21.3 MW battery project in Pittsylvania County, VA. The filing names Berry Hill as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 1, 2028.
| Queue ID | AG2-272 |
|---|---|
| Project name | Tupelo Energy Storage |
| Status (as published) | Active |
| Substation | Berry Hill |
| Point of interconnection | Berry Hill 138 kV |
| County | Pittsylvania |
| State | VA |
| Voltage | 138 kV |
| Capacity | 21.3 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-12-01 |
| Source dataset | cycle |
Same substation and county
Berry Hill substation: 3 requests in the PJM queue, 2 active totaling 96.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF1-049 | Southern Virginia Solar | 75 | Solar | Under Construction |
| AG1-540 | Berry Hill 138 kV | 21.4 | Battery | Withdrawn |
Pittsylvania, VA: 39 requests in the PJM queue, 14 active totaling 751.1 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Tupelo Storage, LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Phase 3 |
| MW energy | 55.0 |
| MW capacity | 21.3 |
| MFO | 55.0 |
| Submitted date | 3/19/2021 |
| Last updated | 8/24/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.