Southern Virginia Solar
PJM queue ID AF1-049
Southern Virginia Solar (AF1-049) is listed in the PJM interconnection queue as a 75 MW solar project in Pittsylvania County, VA. The filing names Berry Hill as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of March 30, 2027.
| Queue ID | AF1-049 |
|---|---|
| Project name | Southern Virginia Solar |
| Status (as published) | Under Construction |
| Substation | Berry Hill |
| Point of interconnection | Berry Hill 138 kV |
| County | Pittsylvania |
| State | VA |
| Voltage | 138 kV |
| Capacity | 75 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-03-30 |
| Source dataset | serial |
Same substation and county
Berry Hill substation: 3 requests in the PJM queue, 2 active totaling 96.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG2-272 | Tupelo Energy Storage | 21.3 | Battery | Active |
| AG1-540 | Berry Hill 138 kV | 21.4 | Battery | Withdrawn |
Pittsylvania, VA: 39 requests in the PJM queue, 14 active totaling 751.1 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 125 |
| MW capacity | 75 |
| MFO | 125 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.