Substation Scout

Dix Solar Farm

PJM queue ID Z2-102

Dix Solar Farm (Z2-102) is listed in the PJM interconnection queue as a 4.9 MW solar project in Burlington County, NJ. The filing names Argonne-New Lisbon as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of August 24, 2017.

Queue IDZ2-102
Project nameDix Solar Farm
Status (as published)In Service
SubstationArgonne-New Lisbon
Point of interconnectionArgonne-New Lisbon 34.5kV
CountyBurlington
StateNJ
Voltage34.5 kV
Capacity4.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2017-08-24
Source datasetserial

Same substation and county

Burlington, NJ: 118 requests in the PJM queue, 31 active totaling 656.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy13
MW capacity4.94
MFO13

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first