Substation Scout

Taylors Lane Solar

PJM queue ID AD2-027

Taylors Lane Solar (AD2-027) is listed in the PJM interconnection queue as a 3.8 MW solar project in Burlington County, NJ. The filing names Camden Switch as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of February 15, 2019.

Queue IDAD2-027
Project nameTaylors Lane Solar
Status (as published)In Service
SubstationCamden Switch
Point of interconnectionCamden Switch 26 kV
CountyBurlington
StateNJ
Voltage26 kV
Capacity3.8 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2019-02-15
Source datasetserial

Same substation and county

Burlington, NJ: 118 requests in the PJM queue, 31 active totaling 656.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy10
MW capacity3.8
MFO10

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first