Perez Solar
PJM queue ID W1-120
Perez Solar (W1-120) is listed in the PJM interconnection queue as a 3.3 MW solar project in Burlington County, NJ. The filing names Pemberton Township 2 as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of October 31, 2017.
| Queue ID | W1-120 |
|---|---|
| Project name | Perez Solar |
| Status (as published) | In Service |
| Substation | Pemberton Township 2 |
| Point of interconnection | Pemberton Township 2 34.5 kV |
| County | Burlington |
| State | NJ |
| Voltage | 34.5 kV |
| Capacity | 3.3 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2017-10-31 |
| Source dataset | serial |
Same substation and county
Burlington, NJ: 118 requests in the PJM queue, 31 active totaling 656.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 8.8 |
| MW capacity | 3.34 |
| MFO | 8.8 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.