Perez Solar

PJM queue ID W1-120

Perez Solar (W1-120) is listed in the PJM interconnection queue as a 3.3 MW solar project in Burlington County, NJ. The filing names Pemberton Township 2 as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of October 31, 2017.

Queue IDW1-120
Project namePerez Solar
Status (as published)In Service
SubstationPemberton Township 2
Point of interconnectionPemberton Township 2 34.5 kV
CountyBurlington
StateNJ
Voltage34.5 kV
Capacity3.3 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2017-10-31
Source datasetserial

Same substation and county

Burlington, NJ: 118 requests in the PJM queue, 31 active totaling 656.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy8.8
MW capacity3.34
MFO8.8

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.