Substation Scout

Columbus-NJ

PJM queue ID R91

Columbus-NJ (R91) is listed in the PJM interconnection queue as a gas request filed at 0 MW (a net change or energy-only filing) in Burlington County, NJ. PJM lists its status as “In Service”, with a target commercial operation date of October 15, 2008.

Queue IDR91
Project nameColumbus-NJ
Status (as published)In Service
SubstationColumbus-NJ
Point of interconnectionColumbus-NJ
CountyBurlington
StateNJ
VoltageNot reported
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Methane
Resource categoryGas (normalized for filtering)
Target commercial operation2008-10-15
Source datasetserial

Same substation and county

Burlington, NJ: 118 requests in the PJM queue, 31 active totaling 656.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy0.37
MW capacity0
MFO0.37

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.