Rock House Draw Gas
ERCOT queue ID 27INR0653
Rock House Draw Gas (27INR0653) is listed in the ERCOT interconnection queue as a 523 MW gas project in Pecos County, TX. The filing names TNCENTRY1_1 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of November 29, 2027. It records the screening study as complete on September 20, 2026.
| Queue ID | 27INR0653 |
|---|---|
| Project name | Rock House Draw Gas |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | TNCENTRY1_1 |
| Point of interconnection | 38431 TNCENTRY1_1 138 KV |
| County | Pecos |
| State | TX |
| Voltage | 138 kV |
| Capacity | 523 MW |
| Resource (as published) | GAS/IC |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2027-11-29 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
TNCENTRY1_1 substation: 3 requests in the ERCOT queue, 3 active totaling 763.2 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 24INR0452 | Longfellow Solar I | 185.2 | Solar | SS Completed, FIS Started, IA |
| 24INR0453 | Longfellow BESS I | 55 | Battery | SS Completed, FIS Completed, IA |
Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-10-05 | Status change | n/a | SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA |
Additional filed fields
| Interconnecting entity | Longfellow Power LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | GAS |
| Technology code | IC |
| Screening study complete | 2026-09-20 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.