Longfellow BESS I

ERCOT queue ID 24INR0453

Longfellow BESS I (24INR0453) is listed in the ERCOT interconnection queue as a 55 MW battery project in Pecos County, TX. The filing names TNCENTRY1_1 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of March 30, 2028. It records the screening study as complete on February 3, 2023, the full interconnection study as approved on December 17, 2025 and the interconnection agreement as signed on April 15, 2025.

Queue ID24INR0453
Project nameLongfellow BESS I
Status (as published)SS Completed, FIS Completed, IA
SubstationTNCENTRY1_1
Point of interconnection38432 TNCENTRY1_1 138 KV
CountyPecos
StateTX
Voltage138 kV
Capacity55 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-03-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

TNCENTRY1_1 substation: 3 requests in the ERCOT queue, 3 active totaling 763.2 MW.

Queue IDProjectMWResourceStatus
27INR0653Rock House Draw Gas523GasSS Completed, FIS Started, No IA
24INR0452Longfellow Solar I185.2SolarSS Completed, FIS Started, IA

Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityCENTURY GAS PROCESSING, LLC
CDR reporting zoneWEST
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2025-04-15
Screening study complete2023-02-03
Full interconnection study approved2025-12-17
Air permitNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.