Longfellow Solar I
ERCOT queue ID 24INR0452
Longfellow Solar I (24INR0452) is listed in the ERCOT interconnection queue as a 185.2 MW solar project in Pecos County, TX. The filing names TNCENTRY1_1 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of December 31, 2028. It records the screening study as complete on February 3, 2023 and the interconnection agreement as signed on April 15, 2025.
| Queue ID | 24INR0452 |
|---|---|
| Project name | Longfellow Solar I |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | TNCENTRY1_1 |
| Point of interconnection | 38431 TNCENTRY1_1 138 KV |
| County | Pecos |
| State | TX |
| Voltage | 138 kV |
| Capacity | 185.2 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-12-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
TNCENTRY1_1 substation: 3 requests in the ERCOT queue, 3 active totaling 763.2 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 27INR0653 | Rock House Draw Gas | 523 | Gas | SS Completed, FIS Started, No IA |
| 24INR0453 | Longfellow BESS I | 55 | Battery | SS Completed, FIS Completed, IA |
Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-09 | Capacity revised | +7 | SS Completed, FIS Started, IA → SS Completed, FIS Started, IA |
Additional filed fields
| Interconnecting entity | CENTURY GAS PROCESSING, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2025-04-15 |
| Screening study complete | 2023-02-03 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.