# Solstice Substation substation interconnection queue

4 active projects totaling 2,707 MW in the ERCOT queue.

4 ERCOT queue filings name # Solstice Substation as the point of interconnection, all in Reeves County, TX.

Target commercial operation dates as filed run from Nov 2027 to Jul 2029 (4 filings). 4 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Energy Forge One LLC (4 filings).

4active projects
2,707active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
29INR0199 Kilby1 Part 6 Large Block Combined Cycle 345 1,056 Gas SS Completed, FIS Started, No IA Jul 2029
28INR0459 Kilby1 Part 4 Large Block Simple Cycle 345 950 Gas SS Completed, FIS Started, No IA Apr 2028
27INR0572 Kilby1 Part 1 Small Block Simple Cycle 345 371 Gas SS Completed, FIS Started, No IA Nov 2027
28INR0457 Kilby1 Part 2 Tier1 BESS 345 330 Battery SS Completed, FIS Started, No IA Jan 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “# Solstice Substation” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.

Other ERCOT queue substations in Reeves County, TX

All 27 ERCOT queue filings in Reeves County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first