# Solstice Substation substation interconnection queue
4 active projects totaling 2,707 MW in the ERCOT queue.
4 ERCOT queue filings name # Solstice Substation as the point of interconnection, all in Reeves County, TX.
Target commercial operation dates as filed run from Nov 2027 to Jul 2029 (4 filings). 4 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Energy Forge One LLC (4 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 29INR0199 | Kilby1 Part 6 Large Block Combined Cycle | 345 | 1,056 | Gas | SS Completed, FIS Started, No IA | Jul 2029 |
| 28INR0459 | Kilby1 Part 4 Large Block Simple Cycle | 345 | 950 | Gas | SS Completed, FIS Started, No IA | Apr 2028 |
| 27INR0572 | Kilby1 Part 1 Small Block Simple Cycle | 345 | 371 | Gas | SS Completed, FIS Started, No IA | Nov 2027 |
| 28INR0457 | Kilby1 Part 2 Tier1 BESS | 345 | 330 | Battery | SS Completed, FIS Started, No IA | Jan 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “# Solstice Substation” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.
- Solstice: Expansion Tracker, ERCOT planning (Pecos County, TX)
Other ERCOT queue substations in Reeves County, TX
- Tap SOLSTICE - SANDLAKE_5: 4 active, 1,633.7 MW of 4 filed
- TNCOYOTSPG1: 2 active, 313.5 MW of 2 filed