Not reported

BPA queue ID G0709

Queue IDG0709
Project nameNot reported
Status (as published)STUDY COMPLETED
SubstationBPA's Slatt Substation
Point of interconnectionBPA's Slatt 230 kV Substation
CountyGilliam
StateOR
Voltage230 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Battery/Energy Storage
Resource categoryBattery (normalised for filtering)
Target commercial operation2023-12-01
Source datasetbpa-generation

Tracked changes

1 change observed between weekly snapshots of the BPA queue since BPA tracking began on September 22, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Status change n/a STUDY → STUDY COMPLETED

Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeNRIS & ERIS
PoiBPA's Slatt 230 kV Substation
Generator TypeEnergy Storage
Fuel SourceBattery
Nameplate Mw Total41
Max Summer Mw0
Max Winter Mw0
Reason Not Completed.

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.