Dumont substation interconnection queue

3 active projects totalling 320 MW in the PJM queue, plus 4 with terminal status (shown greyed).

3active projects
320active MW
7total filed
Queue IDProjectkVMWResourceStatus
V2-019A Dumont 765kV 765 7,900 Not reported Withdrawn
C01-1354 Dumont 345 kV 345 200 Battery Active
AG1-238 Dumont 345 kV 345 90 Solar Withdrawn
AG2-230 Dumont 345 kV 345 90 Solar Active
AH1-152 Dumont 345 kV 345 30 Battery Withdrawn
AH1-153 Dumont 345 kV 345 30 Solar Active
AH1-154 Dumont 345 kV 345 30 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.