Strasburg 138 kV
PJM queue ID C01-1876
Strasburg 138 kV (C01-1876) is listed in the PJM interconnection queue as a 250 MW battery project in Tuscarawas County, OH. The filing names Strasburg as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of October 31, 2030.
| Queue ID | C01-1876 |
|---|---|
| Project name | Strasburg 138 kV |
| Status (as published) | Active |
| Substation | Strasburg |
| Point of interconnection | Strasburg 138 kV |
| County | Tuscarawas |
| State | OH |
| Voltage | 138 kV |
| Capacity | 250 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-10-31 |
| Source dataset | cycle |
Same substation and county
Strasburg substation: 4 requests in the PJM queue, 1 active totaling 250 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AI1-186 | Strasburg 138 kV | 140 | Battery | Withdrawn |
| C01-2049 | Strasburg 138 kV | 140 | Battery | Withdrawn |
| W2-059 | Sight & Sound Theaters | 1 | Other | Withdrawn |
Tuscarawas, OH: 4 requests in the PJM queue, 2 active totaling 440 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Cedar Holdco LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 250.0 |
| MW capacity | 250.0 |
| MFO | 250.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/22/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.