Tuscarawas, OH interconnection queue

2 active projects totalling 440 MW in the PJM queue, plus 2 with terminal status (shown greyed).

2active projects
440active MW
4total filed
Queue IDProjectkVMWResourceStatus
C01-1876 Strasburg 138 kV 138 250 Battery Active
C01-1940 Hillview 138 kV 138 190 Battery Active
AC2-058 Newcomerstown-N. Philly 69kV 69 16.4 Solar Withdrawn
AI1-097 Newcomerstown 12.47 kV 12.5 6.2 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.