Mt. Jackson substation interconnection queue

1 active project totalling 45 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
45active MW
3total filed
Queue IDProjectkVMWResourceStatus
C01-1667 Mt. Jackson 115 kV 115 45 Hybrid Active
AE1-125 Mt. Jackson 34.5 kV 34.5 13 Solar Withdrawn
AC2-074 Mt. Jackson I 35 10.4 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.