Mt. Jackson substation interconnection queue
1 active project totaling 45 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Mt. Jackson as the point of interconnection, all in Shenandoah County, VA.
Target commercial operation dates as filed run from Nov 2020 to Dec 2030 (3 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: Dominion (1 filing).
1active projects
45active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1667 | Mt. Jackson 115 kV | 115 | 45 | Hybrid | Active | Dec 2030 |
| AE1-125 | Mt. Jackson 34.5 kV | 34.5 | 13 | Solar | Withdrawn | Nov 2020 |
| AC2-074 | Mt. Jackson I | 35 | 10.4 | Solar | Withdrawn | Dec 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Shenandoah County, VA
- Strasburg: 1 active, 250 MW of 4 filed