Shenandoah, VA interconnection queue
4 active projects totalling 606.6 MW in the PJM queue, plus 7 with terminal status (shown greyed).
4active projects
606.6active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1401 | Strasburg - Buffalo Marsh 138 kV | 138 | 376.6 | Gas | Active |
| AH1-743 | Not reported | n/r | 255 | Gas | Withdrawn |
| AI1-186 | Strasburg 138 kV | 138 | 140 | Battery | Withdrawn |
| C01-2049 | Strasburg 138 kV | 138 | 140 | Battery | Active |
| AG2-086 | OFW Solar Farm | 115 | 45 | Hybrid | Active |
| C01-1667 | Mt. Jackson 115 kV | 115 | 45 | Hybrid | Active |
| AG1-131 | Edinburg 115 kV | 115 | 15.4 | Solar | Withdrawn |
| AE1-125 | Mt. Jackson 34.5 kV | 34.5 | 13 | Solar | Withdrawn |
| AG1-346 | Mount Jackson DP 115 kV | 115 | 12 | Solar | Withdrawn |
| AH1-179 | Edinburg - Woodstock DP 34.5 kV | 34.5 | 12 | Solar | Withdrawn |
| AC2-074 | Mt. Jackson I | 35 | 10.4 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.