Substation Scout

Shenandoah, VA interconnection queue

4 active projects totalling 606.6 MW in the PJM queue, plus 7 with terminal status (shown greyed).

4active projects
606.6active MW
11total filed
Queue IDProjectkVMWResourceStatus
C01-1401 Strasburg - Buffalo Marsh 138 kV 138 376.6 Gas Active
AH1-743 Not reported n/r 255 Gas Withdrawn
AI1-186 Strasburg 138 kV 138 140 Battery Withdrawn
C01-2049 Strasburg 138 kV 138 140 Battery Active
AG2-086 OFW Solar Farm 115 45 Hybrid Active
C01-1667 Mt. Jackson 115 kV 115 45 Hybrid Active
AG1-131 Edinburg 115 kV 115 15.4 Solar Withdrawn
AE1-125 Mt. Jackson 34.5 kV 34.5 13 Solar Withdrawn
AG1-346 Mount Jackson DP 115 kV 115 12 Solar Withdrawn
AH1-179 Edinburg - Woodstock DP 34.5 kV 34.5 12 Solar Withdrawn
AC2-074 Mt. Jackson I 35 10.4 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.