Greensville Power Station

PJM queue ID AE2-183

Greensville Power Station (AE2-183) is listed in the PJM interconnection queue as a gas request filed at 0 MW (a net change or energy-only filing) in Greensville County, VA. The filing names Rogers Road as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of August 15, 2023.

Queue IDAE2-183
Project nameGreensville Power Station
Status (as published)In Service
SubstationRogers Road
Point of interconnectionRogers Road 500 kV
CountyGreensville
StateVA
Voltage500 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2023-08-15
Source datasetserial

Same substation and county

Rogers Road substation: 5 requests in the PJM queue, 2 active totaling 67 MW.

Queue IDProjectMWResourceStatus
AH1-677Rogers Road 500 kV67GasActive
AH1-385Rogers Road 500 kV65.4SolarWithdrawn
AI2-277Rogers Road 500 kV45BatteryWithdrawn
AG1-160Rogers Road 500 kV30BatteryWithdrawn

Greensville, VA: 58 requests in the PJM queue, 14 active totaling 1,973.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy75
MW capacity0
MFO1756

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first