Bright Stalk Generating Facility
PJM queue ID Z2-087
Bright Stalk Generating Facility (Z2-087) is listed in the PJM interconnection queue as a 26 MW wind project in Livingston County, IL. The filing names Pontiac MidPoint-Brokaw as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 30, 2019.
| Queue ID | Z2-087 |
|---|---|
| Project name | Bright Stalk Generating Facility |
| Status (as published) | In Service |
| Substation | Pontiac MidPoint-Brokaw |
| Point of interconnection | Pontiac MidPoint-Brokaw 345kV |
| County | Livingston |
| State | IL |
| Voltage | 345 kV |
| Capacity | 26 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2019-12-30 |
| Source dataset | serial |
Same substation and county
Pontiac MidPoint-Brokaw substation: 2 requests in the PJM queue, 1 active totaling 26 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AI2-106 | Pontiac MidPoint-Brokaw 345kV | 106.4 | Solar | Withdrawn |
Livingston, IL: 47 requests in the PJM queue, 13 active totaling 1,544.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 200 |
| MW capacity | 26 |
| MFO | 200 |