Substation Scout

Bright Stalk Generating Facility

PJM queue ID Z2-087

Bright Stalk Generating Facility (Z2-087) is listed in the PJM interconnection queue as a 26 MW wind project in Livingston County, IL. The filing names Pontiac MidPoint-Brokaw as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 30, 2019.

Queue IDZ2-087
Project nameBright Stalk Generating Facility
Status (as published)In Service
SubstationPontiac MidPoint-Brokaw
Point of interconnectionPontiac MidPoint-Brokaw 345kV
CountyLivingston
StateIL
Voltage345 kV
Capacity26 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2019-12-30
Source datasetserial

Same substation and county

Pontiac MidPoint-Brokaw substation: 2 requests in the PJM queue, 1 active totaling 26 MW.

Queue IDProjectMWResourceStatus
AI2-106Pontiac MidPoint-Brokaw 345kV106.4SolarWithdrawn

Livingston, IL: 47 requests in the PJM queue, 13 active totaling 1,544.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy200
MW capacity26
MFO200

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.