Pontiac - Dresden 345 kV

PJM queue ID C01-2189

Pontiac - Dresden 345 kV (C01-2189) is listed in the PJM interconnection queue as a 150 MW battery project in Livingston County, IL. The filing names Pontiac - Dresden as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of May 1, 2030.

Queue IDC01-2189
Project namePontiac - Dresden 345 kV
Status (as published)Active
SubstationPontiac - Dresden
Point of interconnectionPontiac - Dresden 345 kV
CountyLivingston
StateIL
Voltage345 kV
Capacity150 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2030-05-01
Source datasetcycle

Same substation and county

Pontiac - Dresden substation: 2 requests in the PJM queue, 2 active totaling 438.6 MW.

Queue IDProjectMWResourceStatus
C01-2184Pontiac - Dresden 345 kV288.6SolarActive

Livingston, IL: 47 requests in the PJM queue, 13 active totaling 1,544.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperEagle Wing Firm Power, LLC
Transmission ownerComEd
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy150.0
MW capacity150.0
MFO150.0
Submitted date4/27/2026
Last updated6/25/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.