Pontiac - Dresden 345 kV
PJM queue ID C01-2189
Pontiac - Dresden 345 kV (C01-2189) is listed in the PJM interconnection queue as a 150 MW battery project in Livingston County, IL. The filing names Pontiac - Dresden as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of May 1, 2030.
| Queue ID | C01-2189 |
|---|---|
| Project name | Pontiac - Dresden 345 kV |
| Status (as published) | Active |
| Substation | Pontiac - Dresden |
| Point of interconnection | Pontiac - Dresden 345 kV |
| County | Livingston |
| State | IL |
| Voltage | 345 kV |
| Capacity | 150 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-05-01 |
| Source dataset | cycle |
Same substation and county
Pontiac - Dresden substation: 2 requests in the PJM queue, 2 active totaling 438.6 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-2184 | Pontiac - Dresden 345 kV | 288.6 | Solar | Active |
Livingston, IL: 47 requests in the PJM queue, 13 active totaling 1,544.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Eagle Wing Firm Power, LLC |
|---|---|
| Transmission owner | ComEd |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 150.0 |
| MW capacity | 150.0 |
| MFO | 150.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/25/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.