Olive-Reynolds #1 substation interconnection queue

1 active project totalling 180 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
180active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG1-302 Mammoth Central II Energy Center 345 180 Solar Under Construction
AI2-401 Olive-Reynolds #1 345 kV 345 48 Hybrid Withdrawn
AD2-138 Olive-Reynolds #1 345kV 345 35.2 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.