Olive-Reynolds #1 substation interconnection queue

1 active project totaling 180 MW in the PJM queue, plus 2 with terminal status (shown grayed).

3 PJM queue filings name Olive-Reynolds #1 as the point of interconnection, all in IN.

Target commercial operation dates as filed run from Dec 2020 to Jan 2028 (3 filings). 1 active filing targets a date after November 27, 2026.

1active projects
180active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG1-302 Mammoth Central II Energy Center 345 180 Solar Partially in Service - Under Construction Jan 2028
AI2-401 Olive-Reynolds #1 345 kV 345 48 Hybrid Withdrawn Dec 2025
AD2-138 Olive-Reynolds #1 345kV 345 35.2 Wind Withdrawn Dec 2020

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-19AG1-302Status changen/a Under Construction → Partially in Service - Under Construction

Other PJM queue substations in Pulaski County, IN

All 21 PJM queue filings in Pulaski County, IN.

Other PJM queue substations in White County, IN

All 37 PJM queue filings in White County, IN.

Other PJM queue substations in Warren County, IN

All 3 PJM queue filings in Warren County, IN.