Substation Scout

White, IN interconnection queue

14 active projects totalling 830.3 MW in the PJM queue, plus 23 with terminal status (shown greyed).

14active projects
830.3active MW
37total filed
Queue IDProjectkVMWResourceStatus
AE1-215 Reynolds 345 kV 345 395 Hybrid Withdrawn
AE1-216 Reynolds 345 kV 345 395 Hybrid Withdrawn
AF2-078 Honey Creek Solar 345 120 Hybrid Engineering and Procurement
AE1-171 Reynolds-Olive 345 kV 345 118 Solar Withdrawn
AI2-098 Meadow Lake 345kV 345 107 Wind Withdrawn
AI2-093 Olive-DeQuine 345kV 345 106.5 Wind Withdrawn
C01-1430 Meadow Lake 345 kV 345 103.1 Wind Active
C01-1535 Reynolds - Meadow Lake 345 kV 345 100 Solar Active
S31 Olive-Dequine 345kV 345 90 Wind Withdrawn
AF1-322 Black Prairie Solar Park 345 84 Solar Under Construction
AH1-481 Reynolds - Meadow Lake #1 345 kV 345 84 Battery Withdrawn
AI2-111 Meadow Lake 345 kV 345 84 Solar Withdrawn
C01-1414 Meadow Lake 345 kV 345 84 Solar Active
AH1-547 Reynolds - Olive #1 345 kV 345 74 Solar Withdrawn
AF2-188 Reynolds-Meadow Lake #1 345 kV 345 67.2 Solar Withdrawn
AE1-197 Reynolds 345 kV 345 65 Wind Withdrawn
AG2-116 Olive-Reynolds 345 #1 345 kV 345 60 Hybrid Withdrawn
AG2-117 Olive-Reynolds #2 345 kV 345 60 Hybrid Withdrawn
AG2-491 Meadow Lake 345 kV 345 60 Solar Active
AI2-395 Reynolds–Olive #1 345 kV 345 59.6 Solar Withdrawn
AI2-096 Olive-Dequine 345kV 345 54 Wind Withdrawn
C01-1426 Meadow Lake 345 kV 345 53.9 Wind Active
AI2-094 Olive-Dequine 345kV 345 53.5 Wind Withdrawn
C01-1428 Meadow Lake 345 kV 345 53.5 Wind Active
AI2-095 Olive-Dequine 345kV 345 50.3 Wind Withdrawn
AI2-401 Olive-Reynolds #1 345 kV 345 48 Hybrid Withdrawn
AI2-097 Olive-Dequine 345kV 345 45.3 Wind Withdrawn
S06 Meadow Lake 345 40 Wind In Service
T183 Olive-Dequine 345kV 345 40 Wind Withdrawn
T184 Olive-Dequine 345kV 345 40 Wind Withdrawn
AF1-207 Hoosier Line Solar 345 34 Solar Engineering and Procurement
AE2-154 Meadow Lake 345 kV (MLV VIII) 345 32.5 Wind Withdrawn
T127 Meadow Lake WF 4 - 5 345 31.8 Wind In Service
AB1-006 Meadow Lake Wind Farm VI 345 26 Wind In Service
AG2-014 Meadow Lake 345 kV 345 20 Battery Active
AG2-492 Meadow Lake 345 kV 345 20 Battery Active
Y2-010 Olive-Meadow Lake 345kV 345 13 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.