Olive-Reynolds substation interconnection queue
2 active projects totalling 264.3 MW in the PJM queue, plus 4 with terminal status (shown greyed).
2active projects
264.3active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF1-215 | Mammoth North Solar Project | 345 | 180 | Solar | In Service |
| AI2-198 | Olive-Reynolds 345 kV | 345 | 108 | Solar | Withdrawn |
| AI2-199 | Olive-Reynolds 345 kV | 345 | 108 | Solar | Withdrawn |
| AE2-045 | Bottlebrush Solar | 345 | 84.3 | Solar | Engineering and Procurement |
| AD2-132 | Olive-Reynolds 345kV | 345 | 35.2 | Wind | Withdrawn |
| AC2-080 | Olive-Reynolds 345kV | 345 | 26 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.