Substation Scout

Reynolds substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AE1-215 Reynolds 345 kV 345 395 Hybrid Withdrawn
AE1-216 Reynolds 345 kV 345 395 Hybrid Withdrawn
AE1-197 Reynolds 345 kV 345 65 Wind Withdrawn
AE1-211 Reynolds 345 kV 345 40 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.