Reynolds substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).
4 PJM queue filings name Reynolds as the point of interconnection, all in IN.
Target commercial operation dates as filed run from Oct 2020 to Dec 2023 (4 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE1-215 | Reynolds 345 kV | 345 | 395 | Hybrid | Withdrawn | Dec 2023 |
| AE1-216 | Reynolds 345 kV | 345 | 395 | Hybrid | Withdrawn | Dec 2023 |
| AE1-197 | Reynolds 345 kV | 345 | 65 | Wind | Withdrawn | Sep 2021 |
| AE1-211 | Reynolds 345 kV | 345 | 40 | Wind | Withdrawn | Oct 2020 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Reynolds” in IN. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- Reynolds: MISO interconnection queue (IN)
- Reynolds Substation: MISO interconnection queue (IN)
- REYNOLDS: MISO interconnection queue (IN)
- Reynolds: Expansion Tracker, PJM planning: AEP state not printed
Other PJM queue substations in White County, IN
- Meadow Lake: 8 active, 444.5 MW of 11 filed
- Olive-Reynolds #2: 3 active, 336 MW of 7 filed
- Reynolds-Olive #1: 3 active, 334 MW of 3 filed
- Olive-Dequine: 4 active, 221.8 MW of 12 filed
- Olive-Reynolds #1: 1 active, 180 MW of 3 filed
- Olive-DeQuine: 1 active, 40 MW of 2 filed
Other PJM queue substations in Jasper County, IN
- Olive-Reynolds: 2 active, 264.3 MW of 6 filed
- Olive-Dequine: 4 active, 221.8 MW of 12 filed