Olive-DeQuine substation interconnection queue

1 active project totalling 40 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
40active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-093 Olive-DeQuine 345kV 345 106.5 Wind Withdrawn
S06 Meadow Lake 345 40 Wind In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.