Olive-DeQuine substation interconnection queue
1 active project totalling 40 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
40active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-093 | Olive-DeQuine 345kV | 345 | 106.5 | Wind | Withdrawn |
| S06 | Meadow Lake | 345 | 40 | Wind | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.