Meadow Lake substation interconnection queue

9 active projects totalling 504.5 MW in the PJM queue, plus 2 with terminal status (shown greyed).

9active projects
504.5active MW
11total filed
Queue IDProjectkVMWResourceStatus
AI2-098 Meadow Lake 345kV 345 107 Wind Withdrawn
C01-1430 Meadow Lake 345 kV 345 103.1 Wind Active
AF1-322 Black Prairie Solar Park 345 84 Solar Under Construction
AI2-111 Meadow Lake 345 kV 345 84 Solar Withdrawn
C01-1414 Meadow Lake 345 kV 345 84 Solar Active
AG2-491 Meadow Lake 345 kV 345 60 Solar Active
C01-1426 Meadow Lake 345 kV 345 53.9 Wind Active
C01-1428 Meadow Lake 345 kV 345 53.5 Wind Active
AB1-006 Meadow Lake Wind Farm VI 345 26 Wind In Service
AG2-014 Meadow Lake 345 kV 345 20 Battery Active
AG2-492 Meadow Lake 345 kV 345 20 Battery Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.