Dequine-Eugene substation interconnection queue

3 active projects totalling 203 MW in the PJM queue, plus 1 with terminal status (shown greyed).

3active projects
203active MW
4total filed
Queue IDProjectkVMWResourceStatus
AG1-226 Dolphin Solar 345 142 Solar EP
U1-024 Dequine-Eugene 345kV 345 65 Wind Withdrawn
AG2-163 Dequine-Eugene 345 kV 345 35 Solar Active
AG1-237 Warren County Wind Energy Center 345 26 Wind Engineering and Procurement

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.