Dequine-Eugene substation interconnection queue
3 active projects totalling 203 MW in the PJM queue, plus 1 with terminal status (shown greyed).
3active projects
203active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG1-226 | Dolphin Solar | 345 | 142 | Solar | EP |
| U1-024 | Dequine-Eugene 345kV | 345 | 65 | Wind | Withdrawn |
| AG2-163 | Dequine-Eugene 345 kV | 345 | 35 | Solar | Active |
| AG1-237 | Warren County Wind Energy Center | 345 | 26 | Wind | Engineering and Procurement |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.