Substation Scout

Olive-Dequine substation interconnection queue

4 active projects totalling 221.8 MW in the PJM queue, plus 8 with terminal status (shown greyed).

4active projects
221.8active MW
12total filed
Queue IDProjectkVMWResourceStatus
Q01 Fowler Ridge WF 345 100 Wind In Service
S31 Olive-Dequine 345kV 345 90 Wind Withdrawn
AI2-096 Olive-Dequine 345kV 345 54 Wind Withdrawn
AI2-094 Olive-Dequine 345kV 345 53.5 Wind Withdrawn
AI2-095 Olive-Dequine 345kV 345 50.3 Wind Withdrawn
Q03 Fowler Ridge 4 WF 345 50 Wind In Service
AI2-097 Olive-Dequine 345kV 345 45.3 Wind Withdrawn
T126 Meadow Lake WF II, Meadow Lake WF III 345 40 Wind In Service
T183 Olive-Dequine 345kV 345 40 Wind Withdrawn
T184 Olive-Dequine 345kV 345 40 Wind Withdrawn
T127 Meadow Lake WF 4 - 5 345 31.8 Wind In Service
U4-003 Olive-Dequine 345kV 345 26 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.