Olive-Dequine substation interconnection queue
4 active projects totalling 221.8 MW in the PJM queue, plus 8 with terminal status (shown greyed).
4active projects
221.8active MW
12total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| Q01 | Fowler Ridge WF | 345 | 100 | Wind | In Service |
| S31 | Olive-Dequine 345kV | 345 | 90 | Wind | Withdrawn |
| AI2-096 | Olive-Dequine 345kV | 345 | 54 | Wind | Withdrawn |
| AI2-094 | Olive-Dequine 345kV | 345 | 53.5 | Wind | Withdrawn |
| AI2-095 | Olive-Dequine 345kV | 345 | 50.3 | Wind | Withdrawn |
| Q03 | Fowler Ridge 4 WF | 345 | 50 | Wind | In Service |
| AI2-097 | Olive-Dequine 345kV | 345 | 45.3 | Wind | Withdrawn |
| T126 | Meadow Lake WF II, Meadow Lake WF III | 345 | 40 | Wind | In Service |
| T183 | Olive-Dequine 345kV | 345 | 40 | Wind | Withdrawn |
| T184 | Olive-Dequine 345kV | 345 | 40 | Wind | Withdrawn |
| T127 | Meadow Lake WF 4 - 5 | 345 | 31.8 | Wind | In Service |
| U4-003 | Olive-Dequine 345kV | 345 | 26 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.