Olive - Reynolds substation interconnection queue

2 active projects totaling 110.7 MW in the PJM queue, plus 3 with terminal status (shown grayed).

5 PJM queue filings name Olive - Reynolds as the point of interconnection, all in Pulaski County, IN.

Target commercial operation dates as filed run from Dec 2022 to Dec 2030 (5 filings). 2 active filings target a date after November 27, 2026.

Transmission owner as filed: AEP (2 filings).

2active projects
110.7active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH2-233 Olive - Reynolds 345 kV 345 100 Battery Withdrawn Dec 2026
AH1-302 Olive - Reynolds 345 kV 345 75 Battery Active Dec 2030
AI2-264 Olive - Reynolds 345 kV 345 48 Solar Withdrawn Oct 2025
AI2-136 Olive - Reynolds 345 kV 345 48 Solar Withdrawn Dec 2022
AH1-305 Olive - Reynolds 345 kV 345 35.7 Solar Active Dec 2030

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Olive - Reynolds” in IN. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.

Other PJM queue substations in Pulaski County, IN

All 21 PJM queue filings in Pulaski County, IN.