0 active projects
totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
0active projects
0active MW
3total filed
Queue ID
Project
kV
MW
Resource
Status
AH1-502
Dequine - Eugene 345 kV
345
150
Battery
Withdrawn
U1-024
Dequine-Eugene 345kV
345
65
Wind
Withdrawn
AD2-138
Olive-Reynolds #1 345kV
345
35.2
Wind
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.