Springfield CSG 1
PJM queue ID AG1-251
Springfield CSG 1 (AG1-251) is listed in the PJM interconnection queue as a 1.9 MW solar project in Delaware County, PA. The filing names McDowell as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of August 31, 2024.
| Queue ID | AG1-251 |
|---|---|
| Project name | Springfield CSG 1 |
| Status (as published) | Suspended |
| Substation | McDowell |
| Point of interconnection | McDowell 12.47 kV |
| County | Delaware |
| State | PA |
| Voltage | 12.5 kV |
| Capacity | 1.9 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2024-08-31 |
| Source dataset | serial |
Same substation and county
McDowell substation: 7 requests in the PJM queue, 2 active totaling 401.9 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-2166 | McDowell 138 kV | 400 | Battery | Active |
| AH2-236 | McDowell 138 kV | 100 | Battery | Withdrawn |
| AE1-141 | McDowell 138 kV | 33 | Hybrid | Withdrawn |
| AE1-239 | McDowell 138 kV | 22.9 | Solar | Withdrawn |
| AE2-277 | McDowell 138 kV | 16 | Solar | Withdrawn |
| AH2-023 | McDowell 12.47 kV | 3.4 | Solar | Withdrawn |
Delaware, PA: 27 requests in the PJM queue, 12 active totaling 934.7 MW.
A substation with the same name is named in PJM transmission planning materials: McDowell (ATSI, 6 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 3.88 |
| MW capacity | 1.9 |
| MFO | 3.875 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.