Substation Scout

McDowell 138 kV

PJM queue ID C01-2166

McDowell 138 kV (C01-2166) is listed in the PJM interconnection queue as a 400 MW battery project in Mercer County, PA. The filing names McDowell as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2031.

Queue IDC01-2166
Project nameMcDowell 138 kV
Status (as published)Active
SubstationMcDowell
Point of interconnectionMcDowell 138 kV
CountyMercer
StatePA
Voltage138 kV
Capacity400 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2031-12-31
Source datasetcycle

Same substation and county

McDowell substation: 7 requests in the PJM queue, 2 active totaling 401.9 MW.

Queue IDProjectMWResourceStatus
AG1-251Springfield CSG 11.9SolarSuspended
AH2-236McDowell 138 kV100BatteryWithdrawn
AE1-141McDowell 138 kV33HybridWithdrawn
AE1-239McDowell 138 kV22.9SolarWithdrawn
AE2-277McDowell 138 kV16SolarWithdrawn
AH2-023McDowell 12.47 kV3.4SolarWithdrawn

Mercer, PA: 57 requests in the PJM queue, 5 active totaling 467.5 MW.

A substation with the same name is named in PJM transmission planning materials: McDowell (ATSI, 6 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperREPA Wayside Church Solar, LLC
Transmission ownerATSI
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy400.0
MW capacity400.0
MFO400.0
Submitted date4/27/2026
Last updated6/5/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.