Southwest Lima substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 6 with terminal status (shown greyed).

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatus
AF1-164 Birch Solar 345 195 Solar Withdrawn
AF1-076 Southwest Lima 138 kV 138 61.6 Solar Withdrawn
AF1-077 Southwest Lima 138 kV 138 61.6 Solar Withdrawn
AA2-075 Southwest Lima 345kV 345 33 Wind Withdrawn
AB2-064 Southwest Lima 345kV 345 15.2 Solar Withdrawn
AG2-488 Southwest Lima 345 kV 345 6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.