Cavett Switch - West Van Wert substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Cavett Switch - West Van Wert as the point of interconnection, all in Van Wert County, OH.
Target commercial operation dates as filed run from Dec 2021 to Dec 2027 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE2-298 | White Trillium | 69 | 29.9 | Solar | Withdrawn | Dec 2027 |
| AF1-029 | Cavett Switch - West Van Wert 69 kV | 69 | 15 | Solar | Withdrawn | Dec 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Van Wert County, OH
- Maddox Creek-RP Mone: 2 active, 280 MW of 4 filed
- Maddox Creek: 3 active, 113.2 MW of 4 filed
- Convoy-East Lima: 1 active, 70 MW of 2 filed
- Southwest Lima: none active of 6 filed
- Marysville-Sorenson: none active of 5 filed
- Haviland – Cavett Switch: none active of 3 filed
Site Scanner