Substation Scout

Haviland – Cavett Switch substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AH1-480 Haviland – Cavett Switch 69 kV 69 57 Battery Withdrawn
AG2-489 Haviland – Cavett Switch 69 kV 69 3.5 Solar Withdrawn
AG2-490 Haviland – Cavett Switch 69 kV 69 1.7 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.