3 active projects totaling 113.2 MW in the PJM queue, plus 1 with terminal status (shown grayed).

4 PJM queue filings name Maddox Creek as the point of interconnection, all in Van Wert County, OH.

Target commercial operation dates as filed run from Dec 2019 to Dec 2027 (4 filings). 3 active filings target a date after November 27, 2026.

3active projects
113.2active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF2-014 Wild Grains Solar 345 90 Solar Under Construction Dec 2027
AE1-102 Blue Creek Wind Farm 345 15.6 Solar Engineering and Procurement Sep 2027
AB2-016 Maddox Creek 345kV 345 13 Wind Withdrawn Dec 2019
AC2-044 Blue Creek Wind Farm 345 7.6 Solar Engineering and Procurement Sep 2027

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Maddox Creek” in OH. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.

Other PJM queue substations in Van Wert County, OH

All 26 PJM queue filings in Van Wert County, OH.