Maddox Creek substation interconnection queue
3 active projects totalling 113.2 MW in the PJM queue, plus 1 with terminal status (shown greyed).
3active projects
113.2active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF2-014 | Wild Grains Solar | 345 | 90 | Solar | Under Construction |
| AE1-102 | Blue Creek Wind Farm | 345 | 15.6 | Solar | Engineering and Procurement |
| AB2-016 | Maddox Creek 345kV | 345 | 13 | Wind | Withdrawn |
| AC2-044 | Blue Creek Wind Farm | 345 | 7.6 | Solar | Engineering and Procurement |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.