Van Wert, OH interconnection queue
6 active projects totalling 463.2 MW in the PJM queue, plus 20 with terminal status (shown greyed).
6active projects
463.2active MW
26total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG1-410 | Butterfly Meadows | 345 | 180 | Solar | EP |
| AG1-411 | Butterfly Meadows | 345 | 100 | Battery | EP |
| AH2-331 | North Delphos - Logtown 138 kV | 138 | 100 | Hybrid | Withdrawn |
| AI2-366 | Maddox Creek-RP Mone 345 kV | 345 | 93.6 | Solar | Withdrawn |
| AF2-014 | Wild Grains Solar | 345 | 90 | Solar | Under Construction |
| R60 | Blue Creek WF | 345 | 70 | Wind | In Service |
| AH2-264 | Logtown - North Delphos 138 kV | 138 | 69 | Solar | Withdrawn |
| AC2-104 | Marysville-Sorenson 765kv | 765 | 65 | Wind | Withdrawn |
| AH1-658 | R. P. Mone 345 kV | 345 | 60 | Solar | Withdrawn |
| AH1-480 | Haviland – Cavett Switch 69 kV | 69 | 57 | Battery | Withdrawn |
| AD1-104 | Marysville-Sorenson 765 kV II | 765 | 52.4 | Wind | Withdrawn |
| AG2-175 | Van Wert-Delphos 69 kV | 69 | 49 | Hybrid | Withdrawn |
| AC1-225 | Sorenson-Marysville 765kV | 765 | 39 | Wind | Withdrawn |
| AC2-001 | Not reported | n/r | 39 | Wind | Withdrawn |
| AA2-075 | Southwest Lima 345kV | 345 | 33 | Wind | Withdrawn |
| AE2-298 | White Trillium | 69 | 29.9 | Solar | Withdrawn |
| W3-088 | Long Prairie Wind I, LLC | 345 | 26 | Wind | Withdrawn |
| AI2-266 | R.P.Mone 345 kV | 345 | 24 | Solar | Withdrawn |
| AH1-538 | East Lima - Haviland 138 kV | 138 | 20 | Hybrid | Withdrawn |
| AE1-102 | Blue Creek Wind Farm | 345 | 15.6 | Solar | Engineering and Procurement |
| AB2-064 | Southwest Lima 345kV | 345 | 15.2 | Solar | Withdrawn |
| AF1-029 | Cavett Switch - West Van Wert 69 kV | 69 | 15 | Solar | Withdrawn |
| AB2-016 | Maddox Creek 345kV | 345 | 13 | Wind | Withdrawn |
| AC2-044 | Blue Creek Wind Farm | 345 | 7.6 | Solar | Engineering and Procurement |
| AG2-489 | Haviland – Cavett Switch 69 kV | 69 | 3.5 | Solar | Withdrawn |
| AG2-490 | Haviland – Cavett Switch 69 kV | 69 | 1.7 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.