Van Wert, OH interconnection queue

6 active projects totalling 463.2 MW in the PJM queue, plus 20 with terminal status (shown greyed).

6active projects
463.2active MW
26total filed
Queue IDProjectkVMWResourceStatus
AG1-410 Butterfly Meadows 345 180 Solar EP
AG1-411 Butterfly Meadows 345 100 Battery EP
AH2-331 North Delphos - Logtown 138 kV 138 100 Hybrid Withdrawn
AI2-366 Maddox Creek-RP Mone 345 kV 345 93.6 Solar Withdrawn
AF2-014 Wild Grains Solar 345 90 Solar Under Construction
R60 Blue Creek WF 345 70 Wind In Service
AH2-264 Logtown - North Delphos 138 kV 138 69 Solar Withdrawn
AC2-104 Marysville-Sorenson 765kv 765 65 Wind Withdrawn
AH1-658 R. P. Mone 345 kV 345 60 Solar Withdrawn
AH1-480 Haviland – Cavett Switch 69 kV 69 57 Battery Withdrawn
AD1-104 Marysville-Sorenson 765 kV II 765 52.4 Wind Withdrawn
AG2-175 Van Wert-Delphos 69 kV 69 49 Hybrid Withdrawn
AC1-225 Sorenson-Marysville 765kV 765 39 Wind Withdrawn
AC2-001 Not reported n/r 39 Wind Withdrawn
AA2-075 Southwest Lima 345kV 345 33 Wind Withdrawn
AE2-298 White Trillium 69 29.9 Solar Withdrawn
W3-088 Long Prairie Wind I, LLC 345 26 Wind Withdrawn
AI2-266 R.P.Mone 345 kV 345 24 Solar Withdrawn
AH1-538 East Lima - Haviland 138 kV 138 20 Hybrid Withdrawn
AE1-102 Blue Creek Wind Farm 345 15.6 Solar Engineering and Procurement
AB2-064 Southwest Lima 345kV 345 15.2 Solar Withdrawn
AF1-029 Cavett Switch - West Van Wert 69 kV 69 15 Solar Withdrawn
AB2-016 Maddox Creek 345kV 345 13 Wind Withdrawn
AC2-044 Blue Creek Wind Farm 345 7.6 Solar Engineering and Procurement
AG2-489 Haviland – Cavett Switch 69 kV 69 3.5 Solar Withdrawn
AG2-490 Haviland – Cavett Switch 69 kV 69 1.7 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.