Marysville-Flatlick substation interconnection queue

5 active projects totalling 896.7 MW in the PJM queue, plus 6 with terminal status (shown greyed).

5active projects
896.7active MW
11total filed
Queue IDProjectkVMWResourceStatus
AC1-096 Marysville-Flatlick 765kV 765 1,277 Gas Withdrawn
AB2-080 Marysville-Flatlick 765kV 765 1,200 Gas Withdrawn
AG2-105 Marysville-Flatlick 765 kV 765 253.7 Solar Withdrawn
AG1-125 Oak Run Solar Project 765 234.9 Solar Engineering and Procurement
AG1-126 Oak Run Solar Project 765 234.9 Solar Engineering and Procurement
AG2-106 Marysville-Flatlick 765 kV 765 150 Battery Active
AG2-107 Marysville-Flatlick 765 kV 765 150 Battery Active
AG2-104 Marysville-Flatlick 765 kV 765 126.9 Solar Active
AI2-328 Marysville-Flatlick 765 kV 765 100 Solar Withdrawn
AI2-329 Marysville-Flatlick 765 kV 765 100 Solar Withdrawn
AI2-330 Marysville-Flatlick 765 kV 765 83.5 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.