Cardington substation interconnection queue

1 active project totalling 200 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
200active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1074 Cardington 138 kV 138 200 Battery Active
AH2-212 Cardington 138 kV 138 69 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.