Marysville-Flatlick 765 kV
PJM queue ID AG2-107
Marysville-Flatlick 765 kV (AG2-107) is listed in the PJM interconnection queue as a 150 MW battery project in Madison County, OH. The filing names Marysville-Flatlick as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of September 30, 2029.
| Queue ID | AG2-107 |
|---|---|
| Project name | Marysville-Flatlick 765 kV |
| Status (as published) | Active |
| Substation | Marysville-Flatlick |
| Point of interconnection | Marysville-Flatlick 765 kV |
| County | Madison |
| State | OH |
| Voltage | 765 kV |
| Capacity | 150 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-09-30 |
| Source dataset | cycle |
Same substation and county
Marysville-Flatlick substation: 11 requests in the PJM queue, 4 active totaling 769.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG1-125 | Oak Run Solar Project | 234.9 | Solar | Engineering and Procurement |
| AG1-126 | Oak Run Solar Project | 234.9 | Solar | Engineering and Procurement |
| AG2-106 | Marysville-Flatlick 765 kV | 150 | Battery | Active |
| AC1-096 | Marysville-Flatlick 765kV | 1,277 | Gas | Withdrawn |
| AB2-080 | Marysville-Flatlick 765kV | 1,200 | Gas | Withdrawn |
| AG2-105 | Marysville-Flatlick 765 kV | 253.7 | Solar | Withdrawn |
| AG2-104 | Marysville-Flatlick 765 kV | 126.9 | Solar | Withdrawn |
| AI2-328 | Marysville-Flatlick 765 kV | 100 | Solar | Withdrawn |
| AI2-329 | Marysville-Flatlick 765 kV | 100 | Solar | Withdrawn |
| AI2-330 | Marysville-Flatlick 765 kV | 83.5 | Solar | Withdrawn |
Madison, OH: 40 requests in the PJM queue, 11 active totaling 3,530 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Oak Run Solar Project, LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Phase 3 |
| MW energy | 0.0 |
| MW capacity | 150.0 |
| MFO | 800.0 |
| Submitted date | 1/29/2021 |
| Last updated | 8/26/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.