Substation Scout

Pickaway, OH interconnection queue

10 active projects totalling 1,128 MW in the PJM queue, plus 25 with terminal status (shown greyed).

10active projects
1,128active MW
35total filed
Queue IDProjectkVMWResourceStatus
AC1-096 Marysville-Flatlick 765kV 765 1,277 Gas Withdrawn
AB2-080 Marysville-Flatlick 765kV 765 1,200 Gas Withdrawn
C01-1953 Adkins - Atlanta 345 kV 345 931.1 Gas Active
AE2-149 Biers Run-Bixby 345 kV 345 291.4 Hybrid Withdrawn
AH2-228 Circleville 138 kV 138 150 Battery Withdrawn
AH1-581 Not reported n/r 134 Solar Withdrawn
AG2-444 Bixby - Biers Run 345 kV 345 122.5 Solar Withdrawn
AF2-210 Foster-Garver Road 345 kV 345 120 Solar Withdrawn
AG2-445 Adkins - Atlanta 345 kV 345 120 Solar Withdrawn
AH2-219 Not reported n/r 100 Battery Withdrawn
AD2-162 Scioto Farms Solar Project 138 73.8 Solar Withdrawn
AE2-319 Mustang County Solar Project 69 66.9 Solar Withdrawn
AG2-471 Circleville - Biers Run 138 kV 138 60 Solar Withdrawn
AH2-214 Not reported n/r 60 Solar Withdrawn
AE2-320 Atlanta 69 kV II 69 46 Solar Withdrawn
AH2-028 Watertower - Kingston 69 kV 69 44 Hybrid Withdrawn
AC1-068 Pickaway County Solar 69 34 Solar In Service
AC1-069 Pickaway County II Solar 69 34 Solar In Service
AC1-165 Buckeye Plains II Solar 69 33.6 Solar In Service
AC1-166 Buckeye Plains Solar 69 33.6 Solar In Service
AI2-269 Circleville 138 kV 138 32.2 Solar Withdrawn
C01-1888 Circleville (05CRCLVS) 138 kV 138 32.2 Solar Withdrawn
AE2-327 Biers Run-Circleville 138 kV 138 31.3 Battery Withdrawn
AH1-329 Circleville - Biers Run 138 kV 138 30 Battery Withdrawn
AI1-098 Circleville 138 kV 138 30 Hybrid Withdrawn
AC2-029 Circleville Solar Energy 138 26.6 Solar Suspended
AH2-006 Harrison - Good Hope 138 kV 138 14.2 Other Withdrawn
C01-1068 Gritty Run 69 kV 69 12.1 Other Active
AH2-028A Watertower - Kingston 69 kV 69 12 Solar Withdrawn
P49 Darby Generating Station 345 9 Gas In Service
R15 Darby Generation Station Units 1-6 345 9 Gas In Service
R84 Pickway #5 n/r 5 Coal In Service
AC2-051 Pickaway Solar n/r 3.8 Solar Withdrawn
AA1-118 Picway 69kV 69 0 Battery Withdrawn
AG2-135 Patel Brothers Energy Storage System 12.5 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.