Adkins substation interconnection queue
3 active projects totaling 48 MW in the PJM queue.
3 PJM queue filings name Adkins as the point of interconnection, all in OH.
Target commercial operation dates as filed run from Jun 2006 to Jun 2017 (3 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| Z1-097 | Darby Generating Station Unites, 1,2,3,4,5,6 | 345 | 30 | Gas | In Service | Jun 2017 |
| P49 | Darby Generating Station | 345 | 9 | Gas | In Service | Jun 2006 |
| R15 | Darby Generation Station Units 1-6 | 345 | 9 | Gas | In Service | May 2007 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Adkins” in OH. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
Other PJM queue substations in Madison County, OH
- Marysville - Flatlick: 1 active, 2,040 MW of 3 filed
- Marysville-Flatlick: 4 active, 769.8 MW of 11 filed
- Beatty-Greene: 2 active, 490.3 MW of 2 filed
- Cardington: 1 active, 200 MW of 2 filed
- Beatty-London: 2 active, 79.2 MW of 3 filed
- Beatty-London III: none active of 2 filed
- Bloom: none active of 2 filed
- Greene - Beatty: none active of 2 filed
Other PJM queue substations in Pickaway County, OH
- Marysville-Flatlick: 4 active, 769.8 MW of 11 filed
- Biers Run-Circleville: 3 active, 138.7 MW of 6 filed
- Atlanta I: 1 active, 34 MW of 2 filed
- Atlanta II: 1 active, 34 MW of 2 filed
- Circleville: 1 active, 26.6 MW of 4 filed
- Adkins - Atlanta: none active of 2 filed
- Circleville - Biers Run: none active of 2 filed
- Watertower - Kingston: none active of 2 filed