Atlanta I substation interconnection queue
1 active project totaling 34 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Atlanta I as the point of interconnection, all in Pickaway County, OH.
Target commercial operation dates as filed run from Jan 2025 to Oct 2028 (2 filings).
1active projects
34active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE2-319 | Mustang County Solar Project | 69 | 66.9 | Solar | Withdrawn | Oct 2028 |
| AC1-068 | Pickaway County Solar | 69 | 34 | Solar | In Service | Jan 2025 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Pickaway County, OH
- Marysville-Flatlick: 4 active, 769.8 MW of 11 filed
- Biers Run-Circleville: 3 active, 138.7 MW of 6 filed
- Adkins: 3 active, 48 MW of 3 filed
- Atlanta II: 1 active, 34 MW of 2 filed
- Circleville: 1 active, 26.6 MW of 4 filed
- Adkins - Atlanta: none active of 2 filed
- Circleville - Biers Run: none active of 2 filed
- Watertower - Kingston: none active of 2 filed