Atlanta I substation interconnection queue

1 active project totalling 34 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
34active MW
2total filed
Queue IDProjectkVMWResourceStatus
AE2-319 Mustang County Solar Project 69 66.9 Solar Withdrawn
AC1-068 Pickaway County Solar 69 34 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.