Atlanta I substation interconnection queue
1 active project totalling 34 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
34active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE2-319 | Mustang County Solar Project | 69 | 66.9 | Solar | Withdrawn |
| AC1-068 | Pickaway County Solar | 69 | 34 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.