Marysville - Flatlick substation interconnection queue

1 active project totalling 2,040 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
2,040active MW
3total filed
Queue IDProjectkVMWResourceStatus
C01-1673 Marysville - Flatlick 765 kV 765 2,040 Gas Active
AH1-582 Marysville - Flatlick 765 kV 765 146.3 Battery Withdrawn
AH1-583 Marysville - Flatlick 765 kV 765 146.3 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.