Marysville - Flatlick substation interconnection queue
1 active project totalling 2,040 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
2,040active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1673 | Marysville 765 kV - Flatlick 765 kV 765 kV | 765 | 2,040 | Gas | Active |
| AH1-582 | Marysville - Flatlick 765 kV | 765 | 146.3 | Battery | Withdrawn |
| AH1-583 | Marysville - Flatlick 765 kV | 765 | 146.3 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.