Beatty-London substation interconnection queue
2 active projects totaling 79.2 MW in the PJM queue, plus 1 with terminal status (shown grayed).
3 PJM queue filings name Beatty-London as the point of interconnection, all in Madison County, OH.
Target commercial operation dates as filed run from Aug 2023 to Dec 2025 (3 filings).
2active projects
79.2active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AC1-078 | Big Plain | 138 | 66 | Solar | In Service | Aug 2023 |
| AI2-392 | Beatty-London 138 kV | 138 | 31.7 | Solar | Withdrawn | Dec 2025 |
| AD1-081 | Big Plain 2 | 138 | 13.2 | Solar | In Service | Aug 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Madison County, OH
- Marysville - Flatlick: 1 active, 2,040 MW of 3 filed
- Marysville-Flatlick: 4 active, 769.8 MW of 11 filed
- Beatty-Greene: 2 active, 490.3 MW of 2 filed
- Cardington: 1 active, 200 MW of 2 filed
- Adkins: 3 active, 48 MW of 3 filed
- Beatty-London III: none active of 2 filed
- Bloom: none active of 2 filed
- Greene - Beatty: none active of 2 filed