Beatty-London substation interconnection queue

2 active projects totalling 79.2 MW in the PJM queue, plus 1 with terminal status (shown greyed).

2active projects
79.2active MW
3total filed
Queue IDProjectkVMWResourceStatus
AC1-078 Big Plain 138 66 Solar In Service
AI2-392 Beatty-London 138 kV 138 31.7 Solar Withdrawn
AD1-081 Big Plain 2 138 13.2 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.