Circleville substation interconnection queue

1 active project totalling 26.6 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
26.6active MW
4total filed
Queue IDProjectkVMWResourceStatus
AH2-228 Circleville 138 kV 138 150 Battery Withdrawn
AI2-269 Circleville 138 kV 138 32.2 Solar Withdrawn
AI1-098 Circleville 138 kV 138 30 Hybrid Withdrawn
AC2-029 Circleville Solar Energy 138 26.6 Solar Suspended

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.