Adkins - Atlanta substation interconnection queue

1 active project totalling 931.1 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
931.1active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1953 Adkins - Atlanta 345 kV 345 931.1 Gas Active
AG2-445 Adkins - Atlanta 345 kV 345 120 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.