Adkins - Atlanta substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Adkins - Atlanta as the point of interconnection, all in Pickaway County, OH.

Target commercial operation dates as filed run from Dec 2024 to May 2031 (2 filings).

Transmission owner as filed: AEP (1 filing).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1953 Adkins - Atlanta 345 kV 345 931.1 Gas Withdrawn May 2031
AG2-445 Adkins - Atlanta 345 kV 345 120 Solar Withdrawn Dec 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-05C01-1953Terminal status931.1 Active → Withdrawn

Other PJM queue substations in Pickaway County, OH

All 35 PJM queue filings in Pickaway County, OH.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first