Adkins - Atlanta substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Adkins - Atlanta as the point of interconnection, all in Pickaway County, OH.
Target commercial operation dates as filed run from Dec 2024 to May 2031 (2 filings).
Transmission owner as filed: AEP (1 filing).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1953 | Adkins - Atlanta 345 kV | 345 | 931.1 | Gas | Withdrawn | May 2031 |
| AG2-445 | Adkins - Atlanta 345 kV | 345 | 120 | Solar | Withdrawn | Dec 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-05 | C01-1953 | Terminal status | 931.1 | Active → Withdrawn |
Other PJM queue substations in Pickaway County, OH
- Marysville-Flatlick: 4 active, 769.8 MW of 11 filed
- Biers Run-Circleville: 3 active, 138.7 MW of 6 filed
- Adkins: 3 active, 48 MW of 3 filed
- Atlanta I: 1 active, 34 MW of 2 filed
- Atlanta II: 1 active, 34 MW of 2 filed
- Circleville: 1 active, 26.6 MW of 4 filed
- Circleville - Biers Run: none active of 2 filed
- Watertower - Kingston: none active of 2 filed